Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Currently, a manual step is required when doing an installation on Dell servers.  After the networking has been set up and the deployment has started, the following message will be shown on the console screen on controller-2 and controller-3:

At this timepoint, both controller-2 and controller-3 should be set to boot from virtual CD/DVD/ISO.

...

  • Log on to the iDrac web interface
  • Select "Launch Virtual Console"
  • In the Virtual Console:
    • Select "Boot | Virtual CD/DVD/ISO" and confirm
    • Select "Power | Reset System (Warm Boot)" and confirm

This Again, this needs to be done for both controller-2 and controller-3.  After this, the installation should continue normally.

...

   FAILED - RETRYING: Verify node provisioning state. Waiting for 60mins max. (277 276 retries left).

This will continue until the above manual step in is completed or a timeout happensAfterwardAfter the manual step, the following messages will appear:

...