To be updated.

The IEC Type 4 AR/VR Oriented Edge Stack is requesting maturity review for Akraino release 4.

This page references the requirements in BP Graduation Review Processes and Criteria specifically the table cell for Incubation -> (Mature) on the second row from the bottom of the page.


The IEC Type 4 AR/VR Oriented Edge Stack project contributors have deployed and validated the BP  with a community member validation lab and LF CD lab with the exact HW and SW configuration for which the maturity review is being requested. All validation labs are connected with Akraino LF CI  Logs on the LF CI servers. The logs are pushed from each validation lab's CD testing, and the logs verifies the validation lab check. 

IEC Type 4 AR/VR Oriented Edge Stack successfully participated in Akraino release R2, R3 and R4's  incubation stage.