Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

1) Cooperation at the organizational level;

Hin Yang is leading signing a MoU at the LF Edge level with OpenGCC and ECC.

Akraino needs to start cooperation after TSC has made a report and decision is passed, and GCC (http://en.opengcc.org/) and ECC (http://en.ecconsortium.org/) need to provide introduction materials in advance.

...