Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Projects that have publicly documented release cycles and plans for LTS.
    1. Akraino has had one public releases release to date (R1 releaseRelease, June 2019) with a second release (R2 Release targeted for November 30, 2019).  See Akraino Releases.
    2. Akraino 's LTS policy is outlined here: 

      Releases

      has specified criteria for graduation to "Mature" and "Core" Releases.  See Graduation Review Criteria. For instance, a Deployment Check for "Core" Release requires deployment in at least 2 production networks/locations with the exact HW and SW configuration. In such case, LTS is assured based on ongoing usage of Blueprint. 
  2. Projects that have themselves become platforms for other projects.
    1. Akraino is today being used in a number of proof-of-concept projects and commercial products.
    2. Some noted examples include: ELIOT: Edge Lightweight and IoT Blueprint Family and Micro-MEC of Akraino which have become platforms for EdgeXFoundry API work.
  3. Projects that are able to attract a healthy number of committers on the basis of its production usefulness (not simply 'developer popularity').
    1. To date, Akraino has over 65 contributors; 30 active contributors in the month of September 2019 alone
    2. Since Nov 1, 2018, there were almost 1131 commits.  Last month (August 2019), there were 110 commits
    3. These commits were made by contributors from many companies to include AT&T, Ericsson, Nokia, Arm, RedHat, Enea, Windriver, Huawei


Image Added


4.

...

Projects that have several, publicly known, end-user deployments.

a. The Akraino user community is globally diverse with contributions in September coming from the US, China, India, and Europe. 

b. Provide graphic

Connected Vehicle Blueprint


  1.  
  2. c. In addition to the commercial and open source products cited above, companies A, B, C and others have products or deployments under way or being developed.


Expectations

Impact Stage projects are expected to participate actively in TAC proceedings, and as such have a binding vote on TAC matters requiring a formal vote, such as the election of a TAC Chair. They receive ongoing financial and marketing support from the Foundation, and are expected to cross promote the foundation along with their activities.

...

  • Have a documented and publicly accessible description of the project's governance, decision-making, and release processes.
  • Have a healthy number of committers from at least two organizations. A committer is defined as someone with the commit bit; i.e., someone who can accept contributions to some or all of the project.
    • To date, Akraino has over 65 contributors; 30 active contributors in the month of September 2019 alone
    • In the month of September 2019, there were almost Z 26 commits.  These commits were made by contributors from many companies to include A, B, CAT&T, Arm, Enea, LF, Nokia
  • Demonstrate evidence of interoperability, compatibility or extension to other LF Edge Projects. Examples may include demonstrating modularity (ability to swap in components between projects).
    • Akraino can interoperate with EdgeX Foundry, which is the current level 3 project.
    • Akraino can also fit within other LF Edge Projects
  • Adopt the Foundation Code of Conduct.
  • Explicitly define a project governance and committer process. This is preferably laid out in a GOVERNANCE.md file and references a CONTRIBUTING.md and OWNERS.md file showing the current and emeritus committers.
    • See governance and committer process at
    • Significantly large contributions must go through the Contributors Process defined here: 
  • Have a public list of project adopters for at least the primary repo (e.g., ADOPTERS.md or logos on the project website)
  • Other metrics as defined by the applying Project during the application process in cooperation with the TAC.
  • Receive a supermajority vote from the TAC and a majority vote of the Governing Board to move to Impact stage. Projects can move directly from At Large to Impact, if they can demonstrate sufficient maturity and have met all requirements.

...