Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The documentation is well prepared and detailed. The Architecture and HW and SW is well specified. The installation and verification are also well specified. There is elaboration on the differences between Rel 3 and Rel 4. In the Installation documentation there is also provided verification instructions. The performed tests are made on load throughput. The latency is left outside as it is dependant on UC Latency requirements. On the Test document, there shall be made some minor refinements to avoid misunderstandings from the text as it is presented the "tested and deployed Architecture" rather than ( as indicated in the text) "The Test ArchitecureArchitecture".

Akraino TSC is recommended to acept accept and thereby, approve the BPs presented set of Documentation for Akraino Rel 4.

...