Note:  When the deployment to all the nodes has completed, “controller-1” will reboot automatically.


A Note on deploying on DELL severs:

Currently, a manual step is required when doing an installation on Dell servers.  After the deployment has started, the following message will be shown on the console screen on controller-2 and controller-3:

Image Added

At this time, both controller-2 and controller-3 should be set to boot from virtual CD/DVD/ISO.

To do this:

  • Log on to the iDrac web interface
  • Select "Launch Virtual Console"
  • In the Virtual Console:
    • Select "Boot | Virtual CD/DVD/ISO"
    • Select "Power | Reset System (Warm Boot)"

This needs to be done for both controller-2 and controller-3.  After this, the installation should continue normally.


As a reference, during this time, viewing the file /srv/deployment/log/cm.log on controller-1 will show the following:

   FAILED - RETRYING: Verify node provisioning state. Waiting for 60mins max. (278 retries left).

   FAILED - RETRYING: Verify node provisioning state. Waiting for 60mins max. (277 retries left).

   FAILED - RETRYING: Verify node provisioning state. Waiting for 60mins max. (277 retries left).

This will continue until the above manual step in completed.  Afterward, the following messages will appear:

   ok: [controller-2 -> localhost]

   ok: [controller-3 -> localhost]


Verifying Deployment

A post-installation verification is required to ensure that all nodes and services were properly deployed.

...