Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Attendees

Agenda

  • Upcoming O-RAN feature freeze

Minutes

Agenda

  • R3 review results - update
  • R3 CI/CD logs - update
  • Discuss development roadmap
    • Use case
    • PCEI Enabler functionality
    • E2E Validation
      • Allen and Gao to talk about validation lab ECM + CU
      • Oleg to talk about validation lab at Equinix
    • API engineering plan for R4 in November

Minutes

  • Updated team on R3 review. PCEI was not accepted as an end-to-end blueprint due to lack of validation environment.
  • Jian Li provided an update on CI/CD and security log generation
  • Gao Chen Wei Chen Gao and Allen provided an overview of the CM/Tencent lab to be built
  • Oleg Berzin provided an overview of the plan for the PCEI validation environment in the Equinix lab
    • Equinix lab will have compute, interconnection, cloud access resources
    • Equinix lab does not have 4G/5G network access. Options:
      • Work with AT&T to enable 4G/5G access
      • Use software simulation
  • The team agreed to proceed with two validation labs (Equinix and Tencent/China Unicom)
  • The team agreed to work on a common set of use cases in the two validation labs:
    • UC1 - UPF Distribution
    • UC2 - Local Break-out
    • UC3 - Location Services
  • Still having an issue with BluVal but seems to be specific to AT&T lab. Tests are passing in Nokia lab
  • Darrin Vallissaid that the second EP100 system will arrive in Santa Clara in two weeks