  1. High Level Overall Requirements
  2. CI, Blueprint Validation Lab Sub-Committee Requirements
    1. Present Pod Topology document.
    2. Peering w/LF Jenkins.
    3. Push logs through Nexus.
    4. Usage of topics for release

      1. Releases >= 1.0 (e.g. 1.xyz, 2.xyz etc) are reserved for BP that have been approved as Core by the TSC (considered ‘GA’ quality).

      2. Releases <1.0 (e.g. 0.xyz etc) are reserved for projects that have not reached the Akraino Core level (i.e. anything that is in Incubation (‘alpha’ quality) and Mature (‘beta’ quality).

    5. Enforcement of Static Code Analysis through SonarCloud (SaaS), WIP LF Release Engineering & Security Subcommittee.

  3. Security Sub-Committee Requirements for Maturity Review Approved by TSC July 11, 2019,please fill in Security Scan Status (Note this is not required for self certification)
  4. Blueprint Validation Framework Feature Project Requirements See TSC meeting and Slides
  5. Projects going for Maturity Review please refer to Maturity Criteria defined by Process subcommittee BP Graduation Review Processes and Criteria (Note this is not required for self certification)
  6. Documentation Sub-Committee Requirements

    User Documents:

    The following documentation with the following sections called out should be on the wiki with links to rest of the sections as applicable. We prefer that the entire doc is on the wiki but we do not require it.

    Architecture  - Blue print Overview and overall architecture

    Release Notes – Summary and What is released

    Installation Doc – Introduction and deployment architecture

    Test Document – Introduction and Overall Test Architecture

    Developer Documents:

    We are also recommending that Blue prints include via ReadtheDocs, with each Blue Print given their own repo, but we do not require it

  7. API Sub-Committee Requirements
  8. Community Sub-Committee Requirements
  9. Process Sub-Committee Requirements
  10. Upstream Sub-Committee Requirements

...