Meeting Details:
Akraino Edge Stack 2 is inviting you to a scheduled Zoom meeting.
Topic: IEC Type 5: SmartNIC for Integrated Edge Cloud (IEC) Blueprint Family
Time: Mar 18, 2020 07:00 PM Pacific Time (US and Canada) Every week on Wed, until Feb 24, 2021, 50 occurrence(s)
Join Zoom Meeting
Meeting ID: 396 153 875
Find your local number: https://zoom.us/u/aExAN61F
Meeting Content (minutes / recording / slides / other):
March 18, 2020:
Repo: Xuan discuss with Trevor about IEC Type 5 repo.
POD: We decide to use community POD: Ampere Pod 2
SmartNic Card: Yongsu and Xuan discuss with Mallox and Broadcom about what kind of smartnic can be supported in this BP. And Mallox ,Broadcom and Intel provide SmartNic hardware resouces.
Learn about R3 release documentation.
March 25, 2020:
- April 9, 2020:
- Doc arrangement for R3 release: doc review is scheduled on May 13. the team has agreed to start doc writing.
- Environment set up: Mellanox worried about ARM server. Tina suggest that UNH has arm server environment, and Mellanox can try to find helper to install the physical card and access remotely.
- ARM environment can be found at: Shared Community Lab
- CMCC will also help to check if CMCC lab can provide ARM server.
- UPF acceleration: cmcc and facebook can hold a follow up meeting sharing their plan for this.
- April 16, 2020:
- Doc arrangement:
- China Mobile(Jia Xuan): R3 Architecture Document of IEC Type 5: SmartNIC for Integrated Edge Cloud (IEC) Blueprint Family
- ByteDance and Mellanox: R3 Installation Document of IEC Type 5: SmartNIC for Integrated Edge Cloud (IEC) Blueprint Family and R3 Test Document of IEC Type 5: SmartNIC for Integrated Edge Cloud (IEC) Blueprint Family
- Environment setup: We decide to use ByteDance environment.
- ByteDance: Setup environment
- Mellanox: Provide scripts and cards
- There are documents for CICD: Jenkins Guide and How to: Push Logs to Nexus
- China Mobile need to check environment in BeiJing International Information Data Center
- Doc arrangement:
- April 30,2020:
- Time line
- Release document : Submit draft doc in May 8th; Final version in May 14th; Document TSC review in May 15th Xuan Jia Peng He
- Pull Code and CI/CD logs in May 15th. Peng He
- Discuss R4 plan in May 25th xiongchun duan Peng He Xuan Jia Qihui Zhao Tiejun Chen Tina Tsou
- China Mobile could provide 2 x86 machines for community. Qihui Zhao Tiejun Chen
- Time line
- May 7, 2020:
- Documentation:
- For installation R3 Installation Document of IEC Type 5: SmartNIC for Integrated Edge Cloud (IEC) Blueprint Family and test case pages R3 Test Document of IEC Type 5: SmartNIC for Integrated Edge Cloud (IEC) Blueprint Family, need to modify, to make it clearly. For instances, installation part contains test steps which need to move into test pages . Peng He xiongchun duan
- Documentation:
- May 14, 2020:
- Documentation:
- Review R3 Installation Document of IEC Type 5: SmartNIC for Integrated Edge Cloud (IEC) Blueprint Family and test case pages R3 Test Document of IEC Type 5: SmartNIC for Integrated Edge Cloud (IEC) Blueprint Family
- Prepare for R3 document TSC review
- Documentation:
- May 20, 2020:
- CICD
- Need to upload CICD log, security-scan logs, source code into AKraino Peng He
- Next Meeting agenda:Prepare for R3 CICD review and R4 planning. yihui wang
- CICD
- JUN 08, 2020:
- Security-scan logs:
- Need to provide security-scan logs, source code into AKrainoPeng He and upload security-scan logsyihui wang
- Documentations modified before this Thursday :
- Need to follow the template doc of R3 architecture documentation yihui wang
- Need to follow the template doc of R3 installation documentation including trouble shooting part Qingchun Song and OVS-DPDK related Peng He
- Need to follow the template doc of R3 release notes Peng He
- Need to follow the template doc of R3 test documents Peng He
- Next meeting agenda:
- Review all documentations modified according to the correspondence templates yihui wang Peng He Qingchun Song
- Push security-scan logs yihui wang Peng He
- Security-scan logs:
- JULY 02, 2020:
- PR template review yihui wang Peng He long chen Qingchun Song
- Maturity Review
- Maturity Review Certification of SmartNIC Please visit this wiki page and see relevant details. yihui wang long chen Peng He
- For BluVal Certification guide: BluVal Certification of The AI Edge: Federated ML application at edge long chen
- For CI/CD log guide: How to: Push Logs to Nexus long chen
- JULY 09, 2020:
- PR template security-relevant part added long chen Qingchun Song
- Maturity Review
- Maturity Review Certification of SmartNIC Please visit this wiki page and see relevant details. yihui wang long chen Peng He
- For BluVal Certification guide: BluVal Certification of The AI Edge: Federated ML application at edge and Bluval - Akraino blueprint validation framework long chen Peng He, and for our project only focusing on Lynis validation long chen Qingchun Song
- if there is any problem, please send an email with title #bluval to featureprojects@lists.akraino.org after subscribe it.
- For CI/CD log guide: How to: Push Logs to Nexus long chen yihui wang
- JULY 16, 2020:
- Maturity Review
- Maturity Review Certification of SmartNIC Please set up the environment finish the HW definition check part with the diagram describing the architecture how mellanox lab testing the ovs-dpdk offload into smartnic long chen Qingchun Song
- For BluVal Certification guide: BluVal Certification of The AI Edge: Federated ML application at edge and Bluval - Akraino blueprint validation framework long chen Peng He, and for our project only focusing on Lynis validation and prepare the environment before searching tutorial from thor yihui wang
- JULY 23, 2020:
- Maturity Review
- Maturity Review Certification of SmartNIC Please set up the environment finish the HW definition check part with the diagram describing the architecture how mellanox lab testing the ovs-dpdk offload into smartnic long chen Qingchun Song
- For BluVal Certification guide: BluVal Certification of The AI Edge: Federated ML application at edge and Bluval - Akraino blueprint validation framework long chen Peng He, and for our project only focusing on vuls and Lynis validation and please pay attention to the maturity pass and fail critiria Steps To Implement Security Scan Requirements Peng He
- JULY 30, 2020:
- Maturity Review
- Maturity Review Certification of SmartNIC the ovs-dpdk offload into BF smartnic is going to be finished till next Monday and please fufill the jenkins log long chen Qingchun Song Peng He
- For BluVal Certification guide: BluVal Certification of The AI Edge: Federated ML application at edge and Bluval - Akraino blueprint validation framework long chen Peng He, and for our project only focusing on vuls and Lynis validation and please pay attention to the maturity pass and fail critiria Steps To Implement Security Scan Requirements Peng He
- TSC Member election
- Please fulfill the form in this wiki page:TSC Member elections 2020-2021 by making a new row for yourself and if you would like to self nominate as the TSC member please fill the third column with "Yes"
- For the information fo "code merged", "wiki page edits", "Jira Activities", "number of resources committed", you can search the corresponding contents here: https://lfanalytics.io/projects/lfedge%2Fakraino-edge-stack/dashboard by searching your or company name Peng He Qingchun Song long chen
- Chao Han
- September 3, 2020:
- Maturity Review
- For BluVal Certification guide: BluVal Certification of The AI Edge: Federated ML application at edge and Bluval - Akraino blueprint validation framework Chao Han Peng He, and for our project only focusing on vuls and Lynis validation and please pay attention to the maturity pass and fail critiria Steps To Implement Security Scan Requirements Chao Han Peng He
- BluVal Certification is in the processing and the problems need to be resolved including adding the file for supporting the debian system Peng He and debugging Chao Han
- September 10, 2020:
- Maturity Review
- For BluVal Certification guide: BluVal Certification of The AI Edge: Federated ML application at edge and Bluval - Akraino blueprint validation framework Chao Han Peng He, and for our project only focusing on vuls and Lynis validation and please pay attention to the maturity pass and fail critiria Steps To Implement Security Scan Requirements Chao Han Peng He
- BluVal Certification is in the processing and the problems need to be resolved including adding the file for supporting the debian system Peng He and debugging Chao HanR
- R4
- October 29, 2020:
- November 05, 2020:
- R4:
- The architecture and comparison model of the R4 CT function validation was discussed and please check which version of OVS-DPDK applied in R4 Peng He
- R4 environment detailed model checked and make sure if we need the spirent testcenter Chao Han
- The R4 planning wiki page: Release 4 Planning
- Maturity Review
- Bluval debugging problem, please check if the bug type involved in Akraino CVE Vulnerability Exception Request Chao Han, and details can found here:https://access.redhat.com/security/cve/CVE-2019-12900
- R4:
- April 15 IST 2021:
- Participants - Tina Tsou Catherine, Vijay Annamalaisamy, Sathya Durai
- Brett Preston - Bret, please upload this meeting recording.